PROJECT FORECAST
Materials will be loaded on roof
Dump bin will be placed out front
Foreman goes over project with team (safety brief)
Shingles are removed
Decking inspected
Metals installed (drop edge/flashing)
Ice and water installed
Vapor barrier installed
Started strips installed
Shingles Installed
Metal valleys installed as shingling is taking place
Ridge capping/vents installed
Site cleaned
Inspection completed by project manager
Clean-up inspected by project manager
Home-owner walkthrough done by project manager
ALBERTA
BUILDING CODE
4 nails per shingle strip
2- inch overlap on layers of shingles
Valleys shingled over
No drip edge
Felt underlay
TOP
DAWG
STANDARDS
6 nails per shingle strip
4-inch overlap on layers of shingles
Metal Valleys
Metal drip edge
IKO Stormtite synthetic underlay
Reinforced starter strip
IKO Stormshield ice & water protect
Vent upgrades
Heavy-duty ridge caps